Scope
Owner’s Engineer – Preconstruction
Benefits of Project
FCC, one of the leading Construction & Infrastructure Services Groups in Spain, approached STA to seek assistance in building their first Solar Thermal plant to be built in Palma del Río, Spain.
They had recently acquired the project from a developer and required help to ensure its feasibility and bring it to reality by engaging an EPC contractor.
Time was crucial because of the pre-registry system that demanded the plant to come into operation before the end of year 2012. Contract was assigned in April 2010.
Work carried out
STA carried out the following works:
The plant was successfully commissioned in October 2012 and is currently in operation.
(*) Prepared for 7.5 hours TES to be built in a later stage